ͼֽҪԼ˵Ã÷-ÖÐÓ¢°æ
±±¾©Ê׶¼»ú³¡»ú¿âÌì´°£¨Í³Ò»¿Ú¸Ç£©
Beijing capital airport skylight (unified cover)
°´ÕÕͼֽÉϵÄ˵Ã÷£¬¸ù¾ÝÃèÊöº¯ÊýºÍÎݶ¥ËµÃ÷ÖеÄÎݶ¥Éè¼Æ£¬Ìì´°²ÉÓþÛ̼Ëáõ¥(PC)¶à±Ú°å²Ä£¬×°±¸Óд°¿òÊú¿ò×ÔÓÉÁ¬½Ó°å¡£
According to the information on the drawings, and in accordance with description of the function and roof design, skylight adopt wall plank of polycarbonate (PC), which equipped with window mullion free connection plate.
¹â͸ÉäÂÊ ca.£¨Æ½·½¹«³ß£© 45 %
É«²Ê É¢Éä¹â·ÀÒ«ÑÛµÄÈé°×É«
×ÏÍâ͸¹ýÐÔÄÜ 0%
uÖµ 1 ,45W/m²K»òÕ߸üµÍ
×ÏÍâ·À»¤ 80 – 100 µ
Ë®ºÍ¿ÕÆøµÄÉø͸ÐÔ ·ûºÏDIN EN 12207¹æ¸ñ
140 -200cmµÄ¾²Ö¹-×ÔÓÉÏÒ³¤ ·ûºÏDIN 1055¹æ¶¨µÄ75 kg/mÑ©ÔغÉ×°
»ðÖÖ ·ûºÏDIN 4102¹æ¶¨B 1(²»Ò×ȼ)²»È¼ÉÕÐԵιà
°å²ÄÄ©¶ËµÄ·â¿Ú ¶¥¶Ë—ÂÁ·âÌõ
Light transmission rate of ca. 45% (square meters)
Scatter light against bright ivory color
Ultraviolet through performance by 0%
U value is 1, 45 w/m squared K or lower
80-100 (including uv protection
Water and air permeability in accordance with DIN EN 12207 specifications
Stillness of the 140-200 - cm - free chord length meet the requirements of DIN 1055 75 kg/m snow load
Fire Comply with DIN 4102 B 1 (non-flammable) no combustibility drip irrigation
End of the seal Top - aluminum seal
µ×²¿Ä©¶Ë—³¨¿ª£¨ÕôÆû£©
Bottom end - open (steam)
Áª½Ó¾Û̼Ëáõ¥PC °å²Ä½á¹¹µÄËÄÖÜ£¬²ÉÓÃÂÁ¿ò¼Ü¹¹ÔìÍâÐΡ£¸ù¾Ý¸É·¨Ê©ÓÔÔÔò£¬³ö³§³ÉÆ·µÄÄÚ²¿ºÍÍⲿ²ÉÓÃEPDMµæƬ¡£ ÂÁ¿ò¼Ü½á¹¹µ×²¿£¬Ã¿40 ÀåÃ×ÉèÓÐÅÅË®²Û¡£
·ûºÏ³Ð°üÉÌÌṩµÄͼֽ£¬Îݶ¥¼¹ºÍÎÝéܲÉÓýðÊô±¡°å¡£
Connecting structure of the board of polycarbonate (PC), roof and eave apply aluminum frame structure form. According to the principle of dry glazing, the factory finished the internal and external product by using of EPDM gaskets. Aluminum frame structure is arranged at the bottom, every 40 cm shall have a sink.
È«²¿¾Û̼Ëáõ¥PCÁ¬½Ó´¦µÄ°²×°±ØÐë¾¹ýÃÜ·â·ÀË®´¦Àí¡£
In accordance with the drawings provided by contractor, sheet metal roof ridge and the eaves shall have water resistance measure.
ϵͳµÄ°²×°·ûºÏÖÆÔìÉÌÊÖ²á
ÖÆÔ죺 ¾Û̼Ëáõ¥(PC) ²ÄÁÏ
×ÔÈ»¹â TC 1
³¤¶È1 8£¬5Ã×£¬¿í¶È1£¬4Ã×
°üÀ¨15¸öͨ·çÕÛÒ¶ 2 ×ÔÈ»¹â ¼Û¸ñ/×ÔÈ»¹â ºÏ¼Æ14.270€
×ÔÈ»¹â TC 2
³¤¶È1 8£¬5Ã×£¬¿í¶È1£¬4Ã× 3 ×ÔÈ»¹â ¼Û¸ñ/×ÔÈ»¹â ºÏ¼Æ4.403€
×ÔÈ»¹â TC 3
³¤¶È1 8£¬5Ã×£¬¿í¶È2£¬0Ã× 14 ×ÔÈ»¹â ¼Û¸ñ/×ÔÈ»¹â ºÏ¼Æ26.286€
×ÔÈ»¹â TC 4
³¤¶È18£¬5Ã×£¬¿í¶È2£¬0Ã×
°üÀ¨48¸öͨ·çÕÛÒ¶ 12×ÔÈ»¹â ¼Û¸ñ/×ÔÈ»¹â ºÏ¼Æ53.631€
×ÔÈ»¹â TC 5
³¤¶È1 8£¬5Ã×£¬¿í¶È2£¬0Ã× 4×ÔÈ»¹â ¼Û¸ñ/×ÔÈ»¹â
°üÀ¨12ͨ·çÕÛÒ¶ ºÏ¼Æ15.285 €
All the installation of polycarbonate (PC) joint must be sealed waterproof processing.
Installation of the system shall conform to the manufacturer manual
Manufacturing: polycarbonate (PC) material
Natural light TC 1
1, 8, 5 m length, the width of 1, 4 meters
Including 15 ventilation folding leaves 2 natural light price/natural light total 14.270 euro
Natural light TC 2
1 8, 5 m in length, the width of the 1, 4 m 3 natural light price/natural light total 4.403 euro
Natural light TC 3
1, 8, 5 m in length, width, 2, 0 m 14 natural light price/natural light total 26.286 euro
Natural light TC 4
Length of 18, 5 meters, width of 2, 0 m
Including 48 ventilation folded leaves 12 natural light price/natural light total 53.631 euro
Natural light TC 5
1, 8, 5 m in length, width, 2, 0 m 4 natural light price/natural light
Including 12 ventilation fold leaf total 15.285 euro
Ôö¼ÓµÄͨ·çÕÛÒ¶£º
Increased ventilation folds leaf:
ͨ·ç¿ÚÕÛÒ¶µÄÈÕ³£Í¨·ç×°±¸ÓÐÒƶ¯µç»ú
¶ÔÓÚϵͳÀ´Ëµ£¬´øÓÐË®´«µ¼µÄ¼¯³É»¯ÍäÇú±¡½ðÊô°åͨ·çÕÛÒ¶£¬²à²¿²ÄÁϲÉÓþÛ̼Ëáõ¥(PC) °å²ÄºÍÏàͬµÄÉÏÓÔ²ÄÁÏ£¬ÓµÓÐ×ÔÈ»¹âµÄЧ¹û¡£Í¨·çÕÛÒ¶µÄ¹Ì¶¨ºáÁºµç¶¯»ú£º24Volt£¬Éϳå³Ì 500ºÁÃ×
¼Û¸ñ/ µç¶¯»ú496£¬00€
Vents folded leaves daily ventilation motor equipped with a mobile
As for system, it is required applied water conduction bending sheet metal folding ventilation, lateral material with polycarbonate (PC) plate and the same glaze material, have the effect of natural light. Ventilation fold the leaves of the fixed beam motor: 24 volt, stroke on 500 mm
Price/motor 496, 00 euro
´úÓÃ
ÑÌÈÈÊèÉ¢ÕûºÏ¹¦ÄÜÈÕ³£Í¨·çÕÛÒ¶Òƶ¯µç»ú
´øÓÐÈÕ³£Í¨·ç×ۺϹ¦ÄܵÄϵͳ¼¯³ÉÑÌÈÈÊèɢͨ·çÕÛÒ¶£¬×°±¸ÓÐÍäÇú½ðÊôµ¼Æ¬£¬°üÀ¨ÎªÉÏÊöÖ¸¶¨µÄ¾Û̼Ëáõ¥(PC)Ôª¼þµÄ²à²¿²ÄÁÏÒÔ¼°²ÉÓÃÏàͬµÄÉÏÓԵIJÄÁÏ£¬ÓµÓÐ×ÔÈ»¹âµÄЧ¹û¡£
¹Ì¶¨ºáÁºÑÌÈÈÊèÉ¢µç»ú£¬24Volt£¬ÉÏÐÐ³Ì 500/1000ºÁÃס£µ÷ÕûÑÌÈÈÊèÉ¢¹¦ÄÜ
Îݼ¹µÄת¶¯ÖÐÐÄ£¬µ×²¿ÏòÍâ´ò¿ª¡£
¼Û¸ñ/ µç¶¯»ú617£¬00 €
ÖÆÔ죺 Rodecaϵͳ
Substitute
Hot smoke evacuation everyday ventilated fold lobes motor integration function
With the function of daily ventilation comprehensive system integration heat smoke evacuation and ventilation folded leaves, is equipped with bend metal guide, including polycarbonate (PC) for the above specified components of lateral materials, and using the same glaze material, have the effect of natural light.
Hot smoke evacuation motor fixed beams, 24 volt, trip on 500/1000 of a millimeter. Adjust the heat smoke evacuation function
At the bottom of the roof of the center of rotation, open outward.
Price/motor 617, 00 euro
Manufacturing: Rodeca system
Ä¿Ç°µÄ»ðÔÖ¾¯±¨ÏµÍ³ÑÌÈÈÊèÉ¢¿ØÖÆÖÐÐÄ
ÑÌÈȱ¨¾¯Æ÷Ⱥ×é¿ØÖÆËùÓеĿڸÇ
ͬʱ°üÀ¨£º
¿ØÖÆ1-6 ͨ·ç×éµÄÈÕ³£Í¨·ç¿Ú
¿ØÖÆÈ«²¿Í¨·çÕÛÒ¶µÄ·À·ç-Óê×é¼þºÍ´«¸ÐÆ÷
ÑÌÈÈÊèÉ¢ÕÛÒ¶ºÍÈÕ³£Í¨·çµÄÕûºÏµÄÑÌÈÈÊèÉ¢ÕÛÒ¶¡£
¾¯±¨¿ØÖÆÕ¾½ô¼±µçÔ´µÄ72 h³äµçµÄµç³Ø
8.717€
¼Û¸ñ/µ¥Î» ×ܼÆ8.717€
The current hot smoke evacuation fire alarm system control center
Hot smoke alarm group control all of the flap
At the same time include:
1-6 ventilation control group daily air vents
Control all ventilation folded leaves wind - rain components and sensors
Hot smoke evacuation folding leaves and daily ventilation heat integration of smoke evacuation folded leaves.
Alarm control station emergency power supply of 72 h rechargeable battery
8.717 euro
A total of 8.717 euro price/unit
ͨ·çС×鰴Ŧ
Æô¶¯Í¨·çÕÛÒ¶ ÊýÁ¿4¸ö ¼Û¸ñ/Ƭ 54£¬00
ºÏ¼Æ216 €
ÑÌÈÈÊèÉ¢°´Å¥
µ¥Æ¬´¥·¢ÑÌÈÈÊèÉ¢µÄÖ÷ÒªºÍ¶þ¼¶¿ØÖÆÕ¾ÕÛÒ¶
ÊýÁ¿4¸ö ¼Û¸ñ/Ƭ 228
×ÜÊý912€
ÖÆÔ죺 Rodeca»òÕßͬµÈ²úÆ·
Ventilation panel button
Start the ventilation fold the leaf number 4 price/piece of 54, 00
Total 216 euros
Hot smoke evacuation button
Single chip trigger hot smoke evacuation of the main and secondary control station folded leaves
Number 4 price / 228
A total of 912 euros
Manufacturing: Rodeca or similar products
µçÀÂ
Ö¸¶¨µçÀ£¬°²×°ÔÚÑÌÈÈÊèÉ¢ÈËÔ±¿ØÖÆÖÐÐĺÍÑÌÈÈÊèÉ¢/ͨ·çÕÛҶС×éÖ¸¶¨µÄλÖᣰ´ÕÕͼֽ˵Ã÷£¬ÓɳаüÉÌÖ´ÐÐ
¹¤µØ
°²×°£¬µç¶¯»úÁ¬½Ó£¬»ðÔÖ¾¯±¨ÏµÍ³Á¬½Ó£¬ÏµÍ³ÊÔÔËÐкÍÔËÐвâÊÔÓÉRODE CA Ing¸ºÔð¡£
ºÏ¼Æ13.700 €
°üÀ¨ÔËÊäµ½±±¾©ÔÚÄÚ¸÷ÖÖ·ÑÓã¬Î´¸¶Ë°ºÍÃâË°
Ô¤Ëã¼ÆË㣺
°²×°£º 4 ¹¤ÈË/1Ìì 1ÉÈÌì´°
¹¤µØ²ÄÁÏ£ºÌì´°= ´óÔ¼20€/Ã×
Cable
Specify cable, installing in the center of the hot smoke evacuation personnel control heat and smoke evacuation/ventilation folding groups the location specified. According to the drawings specifications, performed by the contractor
Construction site
Installation, motor connection, fire alarm system, system commissioning and run tests shall be arranged by RODE CA Ing.
Total 13.700 euro
Including transport to Beijing, unpaid fees and taxes and tax exemption
The budget calculation:
Installation: 4 workers / 1 day 1 window
Construction materials: skylight = about 20 euro/m
2014.6.13