酸碱系统泄漏的处理

发布时间:2014-12-19      阅读次数:1081

第三节 酸碱系统泄漏的处理
一.系统泄露:
1.迅速查明泄漏部位。酸雾和刺激味太大时应戴好防护面具,橡胶手套,穿好胶鞋和耐酸工作服,注意

将裤脚放在长筒胶鞋外面,用大量水清洗泄漏点后,进入现场进行检查。
2.管道系统泄漏应迅速切断酸碱来源,关闭高位酸、碱槽或者酸、碱计量箱出口阀,汇报发电运行部,

联系检修单位迅速处理。
3.处理酸碱泄漏事故,应按《电业安全生产规程》有关要求执行。
第四节 厂用电故障处理
一.故障处理原则
1.发生厂用电断电故障,应立即进行下列处理:
首先检查系统受影响情况及备用设备受影响情况,稳定系统。
按电气部分厂用事故处理执行。
报告值长,问明原因,要求有关人员迅速处理。
2.电源恢复后应进行下列工作:
●全面检查本岗位所辖设备有无异常。
● 按照班长或值长命令恢复本岗位正常工作秩序。
● 补给水和凝结水系统如遇再生,按程控操作要求重新进行。
做好故障及处理记录。Section three Measures for leakage of acid and alkali system
I. System leakage
1. Check the leakage area rapidly. It is required to wear the protective mask, rubber

glove, rubber shoes and acid proof work clothes while the acid fog and stimulated taste is

too heavy. Places the bottom of pants leg outside the gum-boots; wash the leakage area with

a large amount of water and enter into the site for inspection.

2. The leakage of piping systems shall shut off the source of acid and alkali to

immediately, close the outlet valve of high position acid, alkali bath or acid and alkali

dosimeter. Report electricity generation operation department and contact the overhaul unit

for further procedure.
3. The process for handling the accident of acid and alkali leakage shall follow the

regulation of “electric power industry regulation for security”.

Section four: Measure for electricity failure of factory
I. Principle of management of failure
1. Implement the following processing immediately in case of the failure of the factory

electricity:
Check the system condition and the backup apparatus; stabilizes the system.
Implements the relevant measures according to the regulation of electric elements of power

plants accident;
Report to the shift supervisor, check the reason of the accident and request concerned

personnel take the relevant measures quickly.

2. Implement the following measures after the power is restored:
●Implements the overall inspection of the abnormal condition of equipment of this post;
●Restores normal operation order of this post according to the command of workshop chiefs

or shift supervisor;
●Resumes the procedure according to the requirements of program control in case that

regeneration situation is occurred for the water supply and condensation water system.
Take a good note for failure and relevant measures;