当前位置:首页 > 专业词汇

checking of wind-powered electricity

发布时间:2015-1-27      阅读次数:1160
  1. The wind electric field runs and monitors
  2. Should listen to and write down the local weather forecast to operate personnel on time in wind electric field, do well accident anticipating and countermeasure of the wind electric field safe operation.
  3. Operating personnel should monitor every parameter change of wind-powered electricity aircrew through the screen of the computer of top management room regularly every day.

10.3.3.1It should be according to aircrew's operation parameter of wind-powered electricity which the computer shows to operate personnel, check and analyse every parameter change, find that the unusual situation should monitor this aircrew in succession through the screen of the computer , and it is essential to make according to the change and deal with. Write the reason exactly in operating the daily record at the same time, carry on trouble record and statistics.

  1. The making an inspection tour regularly of wind electric field
  2. Operating personnel should examine the wind device to the wind-powered electricity aircrew , wind electric field , step up in the high-pressure distribution line in the station , field to carry on the touring inspection regularly , find that the defect is dealt with in time, and register on the minute book of the defect .
  3. Check whether systematic movements are normal whether the wind-powered electricity aircrew has unusual noises , blade operation state , goes off course in operating, whether the cable entangles and twines the situation.
  4. Check whether every part of wind-powered electricity aircrew oozes the oil.

10.3.3.2It is not normal running, or the new equipment while putting into operation in climatic anomaly , aircrew , need increasing and checking the content and number of times touringly.

  1. The checking of wind-powered electricity aircrew is safeguarded
  2. Stepping on the tower inspection regularly and is safeguarded and should be carried on under the manual " shutting down " state of wind-powered electricity aircrew.
  3. Operate personnel and step on the tower and is checked and should be no less than two people to safeguard, but can't step on the tower at the same time . Operating personnel should step on the tower to use the safety belt , wear the safety helmet , wear the safe shoes. The accessories and tool must be put in the tool bag alone, the tool bag must be bound with the safety rope firmly, so as not to fall.
  4. Check the system and the gearbox and other lubricating systems of aircrew's hydraulic pressure of wind-powered electricity to leak, the oil, the oil is warm it is normal, refuel in time when being lower than the regulation the oil.
  5. Should check , fasten the equipment bolt regularly.
  6. Should fetch the oil kind and test analysing to hydraulic pressure system , gearbox , lubricating system regularly, lubricate some timing fuel-injection to the bearing.
  7. Should check safety devices , such as cat ladder , safety rope , lighting equipment ,etc. regularly.

The control cabinet should keep clean , clean regularly.

Should check and maintain the computer system of top management room and communication equipment regularly

  返回>>Top
上一篇:电磁兼容性
下一篇:Shenzhen Airlines
-x